EPC Projects

In today’s global scenario, infrastructure development is an absolute necessity, and Power forms the backbone of any infrastructure development. A world without electricity is an unimaginable situation.

In order to keep up with the rapidly expanding global power demand, PML has reached out into the following core areas in the power sector:
  • Power Generation
  • Power Transmission
  • Distribution Networks and Rural Electrification
  • Solar & Wind Energy

PML’s strength in turnkey power projects remains in the following areas:
  • In House Engineering Facility
  • In house state of the art EHV Power Transformer factory
  • Dedicated Project Procurement Team
  • Qualified and Well Trained Execution Team
  • Long Term Associations with Reputed Indian and International Manufacturers.
  • Committed Core Management Team

“Every Project needs to be completed with the best quality and within the best possible time in order to derive its true benefit and customer satisfaction”.

Establishing 2x100MVA, 220/110/11KV and 1x10 MVA, 110/11 KV substation at Koppal (Halavarthi) in Koppal taluk, Koppal district alongwith the connected 220KV and 110KV lines, on partial turnkey basis, including supply of all Materials, Erection (including Civil Works), Testing and Commissioning.
  • Establishing 2x100MVA, 220/110/11KV and 1x10 MVA, 110/11 KV substation at Koppal (Halavarthi) in Koppal taluk, Koppal district
  • Construction of 110KV Terminal Bay at the existing 110KV substation at Koppal in Koppal taluk, Koppal district
  • Construction of 220KV Double LILO line from existing 220KV Gadag -Lingapur and Harthi - Lingapur line to the proposed 220KV substation at Koppal (Halavarthi) in Koppal taluk, Koppal district (0.061 kms)
  • Construction of 110 KV DCNDC line from the proposed 220KV substation at Koppal (Halavarthi) to the existing 110KV tapping tower towards existing 110KV sub station (2.933 kms)
  • Construction of 110KV DCNDC line to the existing 110KV Substation at Koppal from proposed 220KV substation at Koppal (Halavarthi) (7.383 kms) on partial turnkey basis, including supply of all Materials, Erection (including Civil Works), Testing and Commissioning.
       

The scope Of Work:- Shall include complete project management , design, engineering, Manufacturing ,Supply, Erection ,civil works, testing & commissioning of New Conventional 33/11 KV Substations & associated 33 KV Lines & 11 KV Link Lines and other New 33 KV Lines & Augmentation of conductor of existing 33 KV Lines at Single source responsibility on Turnkey basis.

It Inculdes Supply & installation of Power Transformes, VCB, Isolators, Circuit Breakers, CTs,PTs, 11 KV Switchgear .










 
 
 
Download Catalogue
 
Power Transformer
Power_transformer



CMD


  Shri Surinder Mehta,
  The Founder Chairman
  Chairman's Message-


 

 
 
 home | products & services | design | plant & machinery | management | quality | after-sale services | customer support  
epc projects | valued clients | our offices | awards | photo gallery | news & events | chairman's message | press reviews | sitemap | links & contact 
Copyright Prime Meiden Ltd., 2014, Design, Developed and maintained by Planet PCI Infotech Ltd. for Prime Meiden Ltd.